1183 Glen Road, Lafayette
Sold for $1,995,000
Lot Offered at $1,995,000 Accompanied with a $2,415,000 Branagh Development Construction Contract
Rare Happy Valley Glen Opportunity:
Build This Beautiful Single-Story Dream Home with Branagh Development
5 Bed | 3.5 Bath | 3954± Sq. Ft. | .47± Acre Lot
The Dana Green Team is proud to present 1183 Glen Road. A rare opportunity to purchase a .47± acre lot and customize your finishes as you build a single-story Branagh Development custom home in the heart of Lafayette’s coveted Happy Valley Glen.
With all design and planning permits approved and final building permits expected to be issued in January 2026, the property will be shovel-ready in February 2026. A twelve-month build schedule translates to a February 2027 completion/move in date. Integrated solar, fire sprinklers, and premium construction standards ensure long-term comfort and peace of mind.
This well established, close-knit neighborhood is known for its quiet, tree-lined streets, top-rated Lafayette schools, and unbeatable convenience. Set on a beautifully prepared, fully entitled .47± acre lot near the end of a cul-de-sac, the property offers both tranquility and a strong sense of community.
This single-story Transitional Farmhouse will feature 3,954± square feet of thoughtfully designed living space. Elevated materials, expansive 10-foot ceilings, wide-plank hardwood floors, and custom millwork set the tone for refined everyday living. The open-concept beamed-ceiling great room showcases a stunning stone fireplace and an expansive wall of glass doors that fold into the exterior wall to create a seamless indoor/outdoor connection - perfect for gathering, entertaining, or simply enjoying Lafayette’s year-round sunshine. The chef’s kitchen is anchored by an oversized island and outfitted with Thermador appliances, dual gas ovens, a massive walk-in pantry, and an adjacent built-in wine/wet bar, ensuring both beauty, style and functionality.
The home's private spaces are equally impressive. The luxurious primary suite includes a generous walk-in closet with an island dresser, custom built-ins, while a separate guest ensuite with its own entrance offers comfort and privacy for visitors or multigenerational living.
A dedicated office (or optional fifth bedroom), a mudroom with a dog wash, a laundry room with dual washers and dryers, and a finished garage with epoxy flooring add to the home’s overall ease and thoughtfulness. Outdoor living will be an essential part of the experience, designed to accommodate a pool, bocce court, fire pit, or other resort-style amenities.
Every detail of the home has been carefully addressed to create a smooth and efficient build process. The flat pad, rebuilt retaining walls, improved driveway placement, and vastly improved plateaued rear grade all contribute to an elevated final product that maximizes privacy and view potential.
This exceptional location puts you moments from Lafayette's vibrant Downtown, with its boutique shopping and Michelin-rated dining. The Lafayette Reservoir and Oakwood Athletic Club offer year-round recreation, while top-rated schools are minutes away. With easy access to Highway 24 and BART, San Francisco is a convenient 20-mile commute, creating the perfect balance of suburban tranquility and urban accessibility.
With its thoughtful design, premier setting, and trusted/established builder known for the highest of quality and long lasting refinement, 1183 Glen Road represents a truly special opportunity to create a luxury Lafayette lifestyle tailored to how you live, gather, and grow.
Floorplans










